Through its subsidiary Generación Andina SAC, the Company owns El Carmen, a Run of River hydroelectric operation located in the town of Maravillas, in the District of Monzon in the Department of Huanuco.
El Carmen has been operating since November 2019. The substation is located at a short distance from the powerhouse and receives the interconnection lines from El Carmen and the outgoing 138 kV transmission lines to the Tingo Maria substation.
Power Plants
Installed Capacity
Capacity Factor
Production
Transmission Line
Development Stage
PPA
COD
CO2
El Carmen
8 MW
55% to 70%
˜40 to 50 GWhr / year
67 KM / 60 KV
Operational
20 years– U$55.70/Mwhr – Plus Inflation
November 2019
˜20,000 Tons / year